Duct relocation involves moving or rerouting existing ductwork when the layout or use of a space changes.
Duct reinstatement involves removing, restoring or reconfiguring ductwork as part of returning a leased commercial space to the required handover condition.
Depending on the project, this may involve duct removal, rerouting, extensions, relocation of air outlets or restoration of affected sections.
When the space changes, the ductwork often needs to change with it.
Common requirements
When Is Duct Relocation or Reinstatement Needed?
Office Layout Changes
New rooms, partitions or workspace layouts may require existing duct routes and air outlets to be repositioned.
Tenant Expansion or Relocation
Ductwork may need to be extended, rerouted or relocated when a tenant expands into another area or moves premises.
End-of-Lease Reinstatement
Existing tenant-installed ductwork or modifications may need to be removed or restored before the space is returned to the landlord.
Fit-Out Changes
Existing ducts may need modification when a new tenant’s fit-out no longer matches the previous layout.
Service scope
Duct Reinstatement & Relocation Services
The scope depends on the existing ductwork, the revised layout and the required handover condition.
Duct Relocation
Move existing duct sections to suit revised layouts and project requirements.
Duct Rerouting
Change existing routes where partitions, ceilings or other building works conflict with the current ductwork.
Duct Extension
Extend existing ductwork where additional areas need to be served.
Air Outlet Relocation
Reposition selected diffusers, grilles or duct connections where required by the revised space layout.
Duct Reinstatement
Remove or restore ductwork affected by tenancy changes and handover requirements.
Existing-System Modification
Modify sections of existing ductwork rather than replacing the entire system where suitable.
Ventix focuses on the ACMV and ductwork scope, including duct removal, relocation, rerouting and reinstatement.
Need full office reinstatement beyond ductwork? Ventix works with Offix for wider office reinstatement, including partitions, ceilings, flooring, electrical works, painting and handover preparation.
Relocation may be required when partitions move, rooms are added, tenants expand, layouts change or existing duct routes conflict with new fit-out works.
In some projects, suitable existing ductwork may be retained and modified rather than completely replaced. This depends on its condition, layout and project requirements.
Ventix focuses on ductwork and ACMV-related reinstatement. For complete office reinstatement covering multiple trades and handover works, the wider project can be supported through Offix’s office reinstatement service.
Yes. Testing, Adjusting & Balancing can be carried out where required to confirm and adjust airflow after the ductwork changes.
Planning a move or handover?
Tell Us What Needs to Be Relocated or Reinstated
Send us your current layout, proposed layout, site photos or reinstatement requirements. Our team can review the ductwork changes and advise on the next step.
We will review it and contact you to arrange a survey.
Cookies on this siteWe use cookies for basic site function and, with your permission, anonymous analytics that help us improve the site. You can change your choice any time. Privacy Policy